details

Cart
View large diagramHide diagramView diagramView printable catalogTranslate
2010 RDX(TECH) 5 DOOR 5AT FRONT SUB FRAME - REAR BEAM diagram
Back to Top
sub-frame, fr.stiffener, r. gear boxstiffener, l. gear boxsub-frame assy., rr.rubber, rr. sub-frame mounting(upper) (fr)rubber, rr. sub-frame mounting(lower) (fr)stay, r. rr. sub-frame mounting (fr)stay, l. rr. sub-frame mounting (fr)rubber, rr. sub-frame mountingrubber, rr. sub-frame insulator (upper)plate, rr. sub-frame stopperstay, r. rr. sub-framestay, l. rr. sub-framebolt, flange (14x90)bolt, flange (10x20)bolt, flange (10x20)bolt, flange (12x45)bolt, flange (12x45)bolt, flange (14x135)bolt, flange (14x135)bolt, flange (14x135)bolt, flange (14x135)bolt, flange (14x135)nut, flange (10mm)
    • Sterling Acura of Austin  map

    • Phone: (512) 6913824
    • 4801 S Interstate 35
    • Austin,TX 78744-1806
    • rconrad@sterlingacura.com

    • Parts Manager:
    • Robert Conrad
    • Hours of Operation:
    • Mon-Fri 7:00AM-6:00PM
      Sat 7:00AM-5:00PM
      Sun Closed