View large diagramHide diagramView diagramView printable catalogTranslate
1979 accord LX 3 DOOR 5MT MT MAINSHAFT - MAINSHAFT GEAR diagram
Back to Top
mainshaftmainshaftshaft, reverse idle gearshaft, reverse idle geargear, mainshaft thirdgear, mainshaft thirdgear, mainshaft fourthgear, mainshaft fourthgear, reverse idlegear, reverse idlegear, mainshaft fifthgear, mainshaft fifthsleeve set, synchronizer (3-4)sleeve set, synchronizer (3-4)sleeve set, synchronizer (5)sleeve set, synchronizer (5)ring, synchronizer blocking (50mm)ring, synchronizer blocking (50mm)ring, synchronizer blocking (50mm)ring, synchronizer blocking (50mm)spring, synchronizer blocking (44mm)spring, synchronizer blocking (44mm)spring, synchronizerspring, synchronizerspring, synchronizer (50mm)spring, synchronizer (50mm)spring, synchronizer (50mm)spring, synchronizer (50mm)spacer (25x32x30)spacer (25x32x30)spacer (25x32x30)spacer (25x32x30)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)washer, spring (22mm)nut, flange (22mm)nut, flange (22mm)washer, thrust (20x31.5)washer, thrust (20x31.5)ring, snap (60mm)ring, snap (60mm)bearing, ball (5205) (toyo)bearing, ball (5205) (toyo)bearing, needle (32x37x27) (ntn)bearing, needle (32x37x27) (ntn)bearing, needle (32x37x27) (ntn)bearing, needle (32x37x27) (ntn)
    • Vann York Honda  map

    • Phone: (336) 8212091
    • 422 Eastchester Dr
    • High Point,NC 27262-7631
    • cfvetter@vannyorkauto.com

    • Parts Manager:
    • Carolyn Vetter
    • Hours of Operation:
    • Mon-Fri 7:30AM-6:00PM
      Sat 8:00AM-3:00PM
      Sun Closed